Requirements for Calatrava and San Carlos City Consumers
- PMOS Certificate
- Staking and Inspection (To be evaluated by NONECO Load Meter Inspector)
- Electrical Permit (If from Caltrava, acquire it from Calatrava Municipal Engineering Office; If from San Carlos City, acquire it from San Carlos City Engineer’s Office)
- 2 pcs. 1×1 ID Picture
- Cedula (Photocopy)